Interior demolition of Sears box and demo of existing Sears Auto Center

Demise and split of three cold dark shells

Re-tenant of Sears Box

  • 15,371 SF DSW
  • 32,800 SF Nordstrom Rack
  • 25,115 SF The Fresh Market

20,000 SF Sears Store remained

New ground-up 6,836 SF REI

Construction included all new utilities, a new roof, a new truck dock, re-facing the building with new tenant specific façade treatments on

all three sides


PEMBROKE MALL SEARS CONVERSION


Black location pin icon.

Virginia Beach, Virginia

An arrow pointing upwards over a striped area, with a dotted line above.

181,000 SF

Black arc over white arc over black circle.

Seritage Realty Trust

Black icon and paper and contractor.

SA Group


Similar project in the pipeline? Want to know more?  Contact Us

Interior demolition of Sears box and demo of existing Sears Auto Center

Demise and split of three cold dark shells

Re-tenant of Sears Box

  • 15,371 SF DSW
  • 32,800 SF Nordstrom Rack
  • 25,115 SF The Fresh Market

20,000 SF Sears Store remained

New ground-up 6,836 SF REI

Construction included all new utilities, a new roof, a new truck dock, re-facing the building with new tenant specific façade treatments on

all three sides

PEMBROKE MALL SEARS CONVERSION


Black location pin icon.

Virginia Beach, Virginia

Black and white arc-shaped design with two concentric layers.

Seritage Realty Trust

An arrow pointing up through a diagonally striped area, with a dotted line above.

181,000 SF

Black icon and paper and contractor.

SA Group


Similar project in the pipeline? Want to know more?  Contact Us

PEMBROKE MALL SEARS CONVERSION

Virginia Beach, Virginia

CLIENT:

Seritage Realty Trust


ARCHITECT:

SA Group

 

SIZE:

181,000 SF


DESCRIPTION:


Interior demolition of Sears box and demo of existing Sears Auto Center

Demise and split of three cold dark shells

Re-tenant of Sears Box

  • 15,371 SF DSW
  • 32,800 SF Nordstrom Rack
  • 25,115 SF The Fresh Market

20,000 SF Sears Store remained

New ground-up 6,836 SF REI

Construction included all new utilities, a new roof, a new truck dock, re-facing the building with new tenant specific façade treatments on

all three sides

 



Related Projects